WestLand prepared engineering design plans and specifications for a dewatering project to remove over 6 billion gallons of water from two open pits. WestLand designed a series of pumping stations including a barge pumping system, two in-line booster stations, and three open-system booster stations. The project also included the equipping of a water-filled ventilation shaft with a vertical turbine pump and the design of 7 miles of steel pipeline, including 0.5 miles to be mounted on an existing conveyor system to overcome the construction challenges associated with steep slopes surrounding the pit. The project also included instrumentation and control design, structural and geotechnical design, surge analysis, detailed cost estimates, and environmental permitting.
Project Gallery ....
About Freeport-McMoRan Sierrita Operations
Freeport-McMoRan Sierrita Operations
Questions? We Have Answers.
WestLand is here to help. Experience is only a click away. Or, call your experts at WestLand, (520) 206-9585.
The Project
At A Glance
Project | Freeport-McMoRan Sierrita Operations Pit Dewatering Project |
Completed |
Similar Projects In This Sector
Mining & Industrial
WestLand has been responding to the engineering, environmental, and regulatory challenges facing mining companies since our founding in 1997. At…
Similar Projects by Service
Engineering
Engineering and Excellence Our engineers go beyond project plans to ensure the success of projects from design through construction—adding considerable…