WestLand designed a well field and associated infrastructure for a groundwater mitigation project to intercept impacted groundwater and deliver it back to the plant site. The project consisted of the site and equipping design for 19 new groundwater wells, an open-top welded steel reservoir, a closed-top welded steel reservoir, a booster station, surge tanks, and 13 miles of HDPE pipeline. The project also included medium-voltage transmission, distribution, and switchgear design, low voltage electrical, instrumentation and control design for wells and booster station sites, Pima County and Union Pacific Railroad permitting assistance, surge analysis, detailed cost estimates, environmental permitting, and hazardous operations (HAZOPS) evaluation.
Project Gallery ....
About Freeport-McMoRan Sierrita Operations
Freeport-McMoRan Sierrita Operations
Questions? We Have Answers.
WestLand is here to help. Experience is only a click away. Or, call your experts at WestLand, (520) 206-9585.
The Project
At A Glance
Project | FMI Sierrita Groundwater Mitigation Project |
Completed |
Similar Projects In This Sector
Mining & Industrial
WestLand has been responding to the engineering, environmental, and regulatory challenges facing mining companies since our founding in 1997. At…
Similar Projects by Service
Engineering
Engineering and Excellence Our engineers go beyond project plans to ensure the success of projects from design through construction—adding considerable…