WestLand Resources APS 1

This project highlights the efficiencies of combining the engineering services of WestLand with the construction services of WRI Construction. The project involved replacing well capacity used for cooling and drinking water at the APS Cholla Power Plant in Joseph City, Arizona. WestLand provided a routing study, detailed hydraulic modeling, engineering design, and construction oversight of 14 new production wells and 8,500 linear feet of pipeline ranging from 12 to 42 inches in diameter. Based upon the project constraints, an extremely short timeframe was required for the design and construction of the project. Twenty three individual ADEQ drinking water approvals were acquired by WestLand for the project.